Stratton School

Type: Commercial/Athletic

General Contractor: G + R Construction

Landscape Contractor: Redline Construction

Design Contractor: Irrigation Design and Consulting

Owner: Town of Arlington

Services used:

  • Installation
  • Maintenance

For this project, installation and maintenance were done by Tri-Valley, the design done by others. This was a nine-zone commercial/athletic installation as filed sub bid to school renovation project. We installed the project as specified by the Town of Arlington and the irrigation design consultant.

Project Highlights:

  • Nine zone natural turf athletic install
  • Hunter 2” ICV valves
  • Hunter I-25 stainless rotors
  • Watts 009 2” backflow with meter
  • Meter pad and enclosure
  • Potable type K copper line for drinking fountain

Let’s start working.


If you have any questions or are ready to dive into a project together, please reach out and one of our team members will be in contact with you as soon as possible to discuss next steps.

Contact Us