Stratton School
Type: Commercial/Athletic
General Contractor: G + R Construction
Landscape Contractor: Redline Construction
Design Contractor: Irrigation Design and Consulting
Owner: Town of Arlington
Services used:
- Installation
- Maintenance
For this project, installation and maintenance were done by Tri-Valley, the design done by others. This was a nine-zone commercial/athletic installation as filed sub bid to school renovation project. We installed the project as specified by the Town of Arlington and the irrigation design consultant.
Project Highlights:
- Nine zone natural turf athletic install
- Hunter 2” ICV valves
- Hunter I-25 stainless rotors
- Watts 009 2” backflow with meter
- Meter pad and enclosure
- Potable type K copper line for drinking fountain